Ingenious ServicesGet in touch

Guides ·

A contractor estimate template, free to copy

A free contractor estimate template you can copy, the lines every written estimate needs, and the rule on canceling a contract signed at the home.

A contractor in a hard hat with a clipboard at a front door

A written estimate is often the first document a customer gets from you, and the one they compare with two others. A clear one wins jobs that a cheaper but vaguer one loses, and it prevents the argument at the end about what was included. Below is a template to copy into your own document or spreadsheet, the lines most estimates need, and one federal rule worth knowing if you sign contracts in customers' homes.

This is a practical model, not legal advice: what a contract must contain depends on your state and your trade, and your state's contractor licensing board publishes its own rules.

The template

Copy these sections, in this order:

SectionWhat goes in it
Your businessName, address, phone, email, license number where your state licenses your trade
Customer and job siteCustomer's name, phone, email; the address where the work is done
Estimate number and dateA number you can find later; the date it was written; how long the price holds (for example 30 days)
Scope of workWhat you will do, room by room or area by area, in plain words
MaterialsWhat you will use, brand or grade where it matters, and who buys it
LaborHours or a fixed price per part of the job
ExclusionsWhat is not included: permits, haul-away, repairs found once walls are open
PriceEach line, subtotal, tax where it applies, total, in USD
Payment scheduleDeposit, payments at stages, final payment on completion
TimelineEstimated start and finish, and what can move them (weather, materials, inspections)
ChangesHow a change is priced and approved: in writing, before the work
WarrantyWhat you guarantee and for how long
SignaturesCustomer's acceptance, with date

Lines that prevent arguments

  • Exclusions. Most disputes are about something the customer assumed was included. Write down what is not.
  • Allowances. If the customer still has to pick a tile or a fixture, put an allowance in USD and say that a more expensive choice changes the price.
  • Hidden conditions. Rot under the floor, wiring behind the wall: say how you price what you find once the job is open.
  • Change orders in writing. One line saying every change is priced and signed before you do it.
  • Validity. Material prices move; a date after which the estimate must be confirmed protects you.

Estimate, quote or bid

Customers use the words loosely, so say on the page what yours is. An estimate is your best calculation and can change if the job turns out different; a quote is usually read as a fixed price for the scope written. If your price can move, call it an estimate and say what moves it.

Signing at the customer's home: the three-day rule

If a customer signs a sale of USD 25 or more at their home, the Federal Trade Commission's Cooling-Off Rule usually lets them cancel until midnight of the third business day after the sale, and you must give them a copy of the contract and two copies of a cancellation notice at the time of the sale (16 CFR Part 429: https://www.ecfr.gov/current/title-16/chapter-I/subchapter-D/part-429). For sales at other temporary places, such as a home show, the threshold is USD 130. The rule has exceptions: among them, repairs or maintenance the buyer asked you to come and do (anything extra you sell on that visit is still covered), and a real emergency where the buyer gives up the right in a handwritten, signed statement. Read the rule itself, and your state's, which may be stricter.

Faster estimates start with a better enquiry

Half of a good estimate is asking the right questions before the visit. Our sites' contact forms send each enquiry to your email with what you need to know first: on our example HVAC site the request form asks for name, phone, ZIP, the topic and a time window. For a contractor we add the kind of job, a timeline and photos.

More for your trade: contractor website design, websites for painters, handyman website. A new website is USD 1,500 once.

Tell us what you do and where you do it.

Written with AI help. Sources: the FTC rule linked above, checked 2026-11-02. Not legal advice.